Swing set
Posted: Tue Aug 02, 2016 9:04 pm
The plan
Disassemble this: https://youtu.be/KzehSrFmJAs
And put it here, on the right (background, against the tree line), where all the rock outcropping is: So next week when I am off, and working on digging out the front yard, I will run some dirt back here and attempt to grade it. I should build a box around it also. Then I should put some mulch in there (either delivered or pick some up on the trailer that I'll already have at my house). To say nothing of the swing set itself. Yeah it's going to be a busy week.
Speaking of the swing set.
Has some wood issues in places. But disassembly was reasonably quick with two guys and various tools (impact being one). I'd say maybe 3 hours or so. I put half in my truck and will try to pick up the other half on Friday. Except I think I need a trailer for the main deck of the main structure.
Disassemble this: https://youtu.be/KzehSrFmJAs
And put it here, on the right (background, against the tree line), where all the rock outcropping is: So next week when I am off, and working on digging out the front yard, I will run some dirt back here and attempt to grade it. I should build a box around it also. Then I should put some mulch in there (either delivered or pick some up on the trailer that I'll already have at my house). To say nothing of the swing set itself. Yeah it's going to be a busy week.
Speaking of the swing set.
Has some wood issues in places. But disassembly was reasonably quick with two guys and various tools (impact being one). I'd say maybe 3 hours or so. I put half in my truck and will try to pick up the other half on Friday. Except I think I need a trailer for the main deck of the main structure.